mm
Top of the handrail above the walking level.
mm
Shift from the drawn line; positive = left of drawing direction.
mm
Foot level relative to the active storey (balcony slab below).
Handrail
mm
mm
Posts
mm
mm
mm
Target spacing — posts always land on corners and ends.
Infill
mm
mm
mm
mm
mm
one material for the whole railing
Per-face override of the material above. Stored with
the element, so a rebuild keeps them; empty = inherit (paint the group
as usual).
m
m
Height and Diameter are written from the geometry.
m
True 3D length of the handrail, sloped sections included.